UTD Natural Science and Engineering Research Lab

2016-12-07T03:21:14-06:00

The new building was a four-story cast-in-place concrete building, with typical floors consisting of two-way flat slabs and post tensioned concrete beams. Civil Engineering services consisted of grading for the proposed building pad, design of a fire lane truck access drive and truck dock area, drainage system design, layout of the chilled water mains and water and sewer service taps to the University mains.

Location: Richardson, Texas

Services Provided: Civil and Structral

Square Feet / Area: 190,000 square feet

Year Completed: 2007

DISD Booker T. Washington High School

2016-12-07T03:21:15-06:00

An addition to an existing school building with new a performance hall, dance and rehearsal studios, library, paint and costume shop areas, support facility areas and full corridor atriums. The expansion was designed to architecturally reflect the surrounding Dallas Arts District.

Location: Dallas, Texas

Services Provided: Structural Engineering

Square Feet / Area: Five levels, including two below grade

Year Completed: 2006

DISD Jerry Junkins Elementary School

2016-12-07T03:21:15-06:00

CGA supplied erosion control for site development, stone outlet protection of concentrated storm water flows, a stabilized construction entrance/exit, a silt fence, inlet protection, rock berms, erosion control blankets/matting for slope protection, mulching, seeding and sodding, sediment traps, compost/mulch sediment filter dikes, a dewatering sediment tank and stockpile protection. CGA also developed the storm water pollution prevention plan.

Location: Carrollton, Texas

Services Provided: Civil Engineering

Square Feet / Area: 6.6 acres

Year Completed: 2009

DISD North Dallas High School

2016-12-07T03:21:15-06:00

CGA provided the civil design of a new classroom wing and renovation of the existing structure; services inlcuded dimension control, a paving plan, drainage area map, grading plan, storm sewer plan, erosion control, water and sewer service plans, and the replacement of 850 square feet of concrete steps at the front of the building.

Location: Dallas, Texas

Services Provided: Civil and Structural

Square Feet / Area: N/A

Year Completed: 2005

Go to Top